Nissan 100NX N14 silhouetteN14

Intake Manifold - Disassembly and Assembly (Cont'd) / Installation

EM-104prose procedure

Installation intake manifold tightening order figures differ between SR20DE (SEM087D) and SR20DET (SEM861D).

Disassembly and Assembly (Cont'd)

Disassembly and Assembly - SR20DET (Cont'd)

  1. 8
    Install intake manifold collector.
    SR20DET intake manifold collector with circled numbers 1 through 10 indicating bolt tightening order for installation. Labels 'Engine front' with arrow and 'Tighten in numerical order.'
    SEM842D

Installation

  1. 1
    Install intake manifold.
    SR20DE intake manifold with circled numbers 1 through 8 indicating bolt tightening order for installation. Labels 'Intake manifold', 'Intake manifold collector', and 'Tighten in numerical order.'
    SEM087D
  2. 2
    Reinstall any parts removed in reverse order of removal.

Search Manual

Search pages, specs, and procedures