Nissan 100NX N14 silhouetteN14

Electrical Components Inspection (Cont'd)

EF & EC-352prose procedure

GA16DE engine (header tab).

NEUTRAL SWITCH

Check continuity between terminals (a) and (b).

Neutral Switch Continuity

Shift to Neutral
ContinuityYes
Shift to other position
ContinuityNo
If N.G., replace relay.

Resistor

  1. 1
    Disconnect resistor harness connector.
  2. 2
    Check resistance between terminals (a) and (b).
    Resistance: Approximately 2.2kΩ
    If N.G., replace resistor.
    Resistor connector with an ohmmeter symbol connected to check resistance between terminals (a) and (b).
    SEF334H

Power Steering Oil Pressure Switch

  1. 1
    Disconnect power steering oil pressure switch harness connector.
  2. 2
    Start engine.
  3. 3
    Check continuity between terminals (a) and (b).
    Power steering oil pressure switch connector with pin diagram (a-b) at top and an ohmmeter symbol connected to check continuity between terminals (a) and (b). Disconnect-probe symbols shown at right.
    SEF344K

Power Steering Oil Pressure Switch Continuity

Steering wheel is being turned
ContinuityYes
Steering wheel is not being turned
ContinuityNo

INHIBITOR SWITCH

Check continuity between terminals (a) and (b).

Inhibitor Switch Continuity

Shift to "P" position
ContinuityYes
Shift to "N" position
ContinuityYes
Shift to position other than "P" and "N"
ContinuityNo
If N.G., replace inhibitor switch.

Search Manual

Search pages, specs, and procedures